FA
EN
menu button
search button
language button
language button
WHO WE ARE
Who we are
icon
Where is Azar?
icon
What we do?
icon
Strategic Program
icon
MD’s Message
icon
Investors
icon
Code of Conduct
icon
Capital Resources
icon
Engineering
icon
HSE
icon
QC & QA
icon
Sustainability
icon
Pictorial Documentary
icon
Reach us
icon
OUR PROJECTS
Drilling
icon
Acid Fracturing
icon
Wellheads & Flowlines
icon
Central Process Facilities
icon
Modified Early Production System
icon
Oil and Gas Transport Pipelines
icon
Substation 132/11 KV
icon
Water Supply
icon
OPRF
icon
Pardis" Azar Camp
icon
News
EVENTS
VIRTUAL TOUR 360
PUBLICTIONS
Company Profile
icon
MEDIA
Image Gallery
icon
Video Gallery
icon
MEMBERS
E-mail
icon
Correspondences
icon
News
Pictorial Report: The Presence of Sarvak Azar Engineering and Development Company in the 24th International Oil, Gas, Refining and Petrochemical Exhibition
May 5, 2019
|
News
Pictorial Report: Installation Low Pressure Boards of Post No.2 of the CPF project
March 16, 2019
|
News
Pictorial Report: Installing CIP Chemical Injection Packages for the Waste Water Treatment Package
March 16, 2019
|
News
Pictorial Report: Installation Raw Water Pump at Area 2500 in CPF
March 4, 2019
|
News
Pictorial Report: Concreting Foundation of Coral Pit
March 4, 2019
|
News
Pictorial Report: Installation of the CPF project’s Telecom Tower
February 20, 2019
|
News
Pictorial Report: Installing Control Panels of DCS and ESD Systems in the Central Control Unit of the CPF
February 19, 2019
|
News
Pictorial Report: The first visit by Dr. Manouchehri, OIEC Group Managing Director, from Azar Oil Field
January 20, 2019
|
News
Pictorial Report: Installation Heating Medium Fired Heater Package in Area 2500
January 2, 2019
|
News
Pictorial Report: The 16th JMC Meeting of Azar Oil Field
January 2, 2019
|
News
1
2
3
4
…
11
Next Page
Close