The project shall be implemented in two Early and Final Production stages. There are 19 wells in total, including 8 wells for the early production and 9 additional wells plus appraisal and delineation wells for the final production.

The project consists of a main Engineering, Procurement and Construction (EPC) contract and other activities required for transportation of crude oil produced from each well to the Gathering Manifold located at the inlet of Central Process Facilities (CPF).

These activities include construction of well locations (well pad) for drilling rigs, laying of infield flow lines and optical fiber cables along these flow lines, electric power transmission lines and wellhead facilities (i.e. burn pits, access roads, portakabins which house the Wellhead Control Panels (WHCP), Remote Terminal Units (RTU) for Supervisory Control and Data Acquisition (SCADA) and High Integrity Pressure Protection System (HIPPS) and etc.)